Events with Multiple Days/Spaces
complete
L
Lindsey Crothers
How do I activiate the "sessions" button? It isn't appearing on my end.
E
Emily Rubin
WOW!!! This is so exciting. Can’t wait to try
Luke Hutchison
complete
This feature is now complete!
Reach out to your account manager at support@perfectvenue.com for a free trial of the new feature (it is on our Enterprise Plan).
Link to a video overview: https://www.loom.com/share/d4d4eb1baf6a4fe98618ae19a48f4ca4?sid=17a731ed-8334-4a96-a76c-4c0ee3f387a5
L
Lacey Carroll
This would be game changing, thank you for listening.
Luke Hutchison
in progress
Luke Hutchison
Merged in a post:
Different Times for Different Rooms
C
Callie McFall
For an event that books multiple spaces over multiple days... it would be helpful to have the ability to reserve each space for a different time within the one event. Ex: Retreat that needs 3rd floor room for Saturday only 5-10pm and Banquet Hall for Friday-Saturday 9-5pm
P
Patricia Fields
It would be excellent to have the ability to either just print out multi day events, or SEPERATE into days. So the kitchen would have an easier time with this. Like a separate page for Wed and for Thursday, instead of al together.
R
Ryan McNay
4 years and 150 upvotes - let's get this one rolled out PV team. #essentialfeature
K
Kelsey Flanagan
Merged in a post:
Multiple-day meetings - dates not listed
M
Megan Jensen
I would like to see the dates for multiple day events on the Home screen in the list of upcoming events. For example, if a 2-day meeting starts on 10/12 and ends on 10/13, you only see 10/12 as the meeting date in the list. It can be very confusing and hard to keep track of multiple day meetings when looking at the full list (and I don't want to create two proposals for a two-day event where there the set up is completely the same.)
Also on the Event Summary, BEO, etc., only the first day's date of multi-day meeting shows at the top of the form. I know it is listed to the side but that is in much smaller writing. Need to see it at the top. Right now I have to take a Sharpie and write it in for printed copies.
Callie McFall
Have multiday events show as a date range when pulled up on reports
Load More
→